What does MS equal to you?

May 6th, 2012 by Laina Turner

by Lisa Emrich

What Does MS Equal To You?

MS = a twisted roller coaster, spiraling and without brakes.

I can’t recall the last “real” roller coaster I rode.  Honestly, I’m trying to rack my brain.  Was it during a visit to Disney World in 1985?  Or could it have been in a car driven by a speed demon? (That would be a figurative roller coaster, of course.)

During one ride, the anticipation and excitement about being strapped into a seat and allowing your body to be whirled through the air is intoxicating.  During the other ride, eyes are closed, feet are trying to push the imaginary brake pedal in the passenger seat, and the adrenaline rush is exhausting rather than exhilarating….read more

Subscribe in a reader

 

 

Enhanced by Zemanta

Leave a Reply