The Five Worst Things I Have Done Since Being Diagnosed with MS by Marie Cooper

May 25th, 2012 by Laina Turner
I came across this amazing post. Please read full post here.
Although I am a relatively smart person, I can admit to having done some pretty dumb things in my life. A lot of the dumbest things came after finding out I had MS. I thought if I listed the top five, it might save someone from repeating my blunders.
MISTAKE # 1:  Not immediately making long-term financial plans.
I was eight weeks into a brand-new job in 2005 when I was hospitalized with transverse myelitis, which was followed by a diagnosis of MS. I should have looked into disability right away, even if I wasn’t ready. I should have learned everything I could have about it.
Instead, I went back to work way too soon and focused on keeping my job instead of maintaining my health.
Despite worsening symptoms that were seriously compromising my mobility and function, I kept pursuing a high-stress career that I was both good at and enjoyed. I ignored the handwriting on the wall regarding my own future.
After two frantic years of working 12-hour days, being on call 24/7, determined to prove that MS would not impact my performance, my position was eliminated and I was out of work. Before finding a new job had never been a problem. But things were complicated now.  I couldn’t “pass” any more. Now I needed assistive devices, a cane or a walker or more frequently, a wheelchair, to get around. Huge red flag for hiring managers, although, of course, there is almost no way to prove that.
read full post here.

Leave a Reply